SubWEC_WESRF2

SubWEC
WESRF
WESRF testing of SubWEC PTO unit
Author

Bret Bosma

Published

March 5, 2026

SubWEC_WESRF2 is a test campaign in the WESRF laboratory on the Linear Test Bed(LTB). Students Inyong Kim and Tanvir Alam Shifat are testing real time control algorithms related to WEC control and LTB control.

Duration: 3/2026-?

Facility: WESRF Linear Test Bed

Goals:

SubWEC_WESRF2